Water Transmission Capacity Plan
Project |
Capacity (m3/d) |
Length (Km) |
COD |
Rabigh 4 (Phase-1) |
600,000 |
120 |
2022 |
Riyadh – Qassim |
579,000 |
572 |
2022 |
Khubar-Hafuf |
300,000 |
135 |
2022 |
Ras Muhaisen – Baha |
300,000 |
800 |
2022 |
Ras Al-Khair 2 – Riyadh |
1,000,000 |
1,000 |
2023 |
Tabuk – Ula |
400,000 |
380 |
2023 |
Jazan (Phase-2) |
300,000 |
147 |
2023 |
Rais – Rabigh |
900,000 |
135 |
2025 |
Total |
4,379,000 |
3,289 |