Shuaibah 3
IWP
Capacity
600,000 m3/Day
Shuaibah, Makkah Province
Project Commercial Operation Date (PCOD)
2025
Project Summary
Technology: Reverse Osmosis (R.O)
Contractual model: BOO
Project cost: 3.08B SAR
Levelized Cost: 1.965 SAR/m3
Contractual model: BOO
Project cost: 3.08B SAR
Levelized Cost: 1.965 SAR/m3