
Dammam
ISTP
Capacity
200000 expandable to 350,000 m3/Day
Dammam, Eastern Province
Project Commercial Operation Date (PCOD)
2023
Project Summary
Technology: MBBR
Contractual model: BOOT
Project cost: 845M SAR
Levelized Cost: 1.153 SAR/m3
Contractual model: BOOT
Project cost: 845M SAR
Levelized Cost: 1.153 SAR/m3
Project Developer and O&M


