Yanbu-4 project prices
SWPC is pleased to announce the Levelized Water Costs submitted by the compliant bidders for Yanbu 4 IWP which will be located at Ar Rayyis and will serve Makkah and Madinah regions with potable water:
Consortium | Levelized Water Cost (in SAR/m3) |
Engie – Mowah | 1.7446 |
FCC Aqualia – HAACO – Alfanar | 1.7775 |
ACWA Power – Albabtain – GIC | 1.8435 |
Marubeni Corporation – Marafiq | 1.9168 |
Veolia – Alkhorayef – Al Bawani | 2.0242 |