Rabigh-3
IWP
Capacity
600,000 m3/Day
Rabigh, Makkah Province
Project Commercial Operation Date (PCOD)
2021
Project Summary
Technology: Reverse Osmosis (R.O)
Contractual model: BOO
Project cost 2.6B SAR
Levelized Cost 1.99 SAR/m3
Contractual model: BOO
Project cost 2.6B SAR
Levelized Cost 1.99 SAR/m3