Tabuk 2
ISTP
Capacity
90,000 m3/Day
Tabuk, Tabuk Region
Project Commercial Operation Date (PCOD)
2024
Project Summary
Technology: LUCAS
Contractual model: BOOT
Project cost: 553M SAR
Levelized Cost: 1.533 SAR/m3
Contractual model: BOOT
Project cost: 553M SAR
Levelized Cost: 1.533 SAR/m3